Used Equipment
Used Equipment Used Equipment Network
Sign On  (Which am I?)
 User Email:    
Dealer Dlr#:      PW:  
Used Equipment
Used Equipment
Used Equipment
Buying Equipment
 >Recent Listings
 >Browse Listings
 >Enter Wanted
 >Periodic Bulletins
Selling Equipment
 >See Wanteds
 >Enter For-Sale
Dealers & Services
 >Search Dealers
 >Dealers by Specialty
 >Services & Supplies
 >Recent Brochures
How to Use UEN
 >Buying Equipment
 >Selling Equipment
 >Specialties & Categories
How to Advertise
 >Equipment Dealers
 >Services & Supplies

Used Equipment Directory

feedburner   Subscribe to RSS

Used Equipment
Home   >   Industrial Resources Inc   >   --unknown-- 00 1900


0W2100 WASHING (CONTINUOUS)
Custom No. 3-stge w/blo-off Custom built 3-stage 44'L in-line parts washer, mild steel construction w/15'L Hi-velosity blow off tunnel - 1 gas heated stage: Ref: 16212

CUSTOM 3-STAGE IN-LINE MILD STEEL WASHER & DRYOFF LINEQUOTE 16-212

1.The Washer is Approximately 44’ 0” Overall Length, Including Entry And Exit Vestibules. This Includes (3) Individual Stages For Cleaning/ Phosphate, Rinse And Seal Rinse With Drain Sectio
s Between Each Of The Tanks.

2.Each Tank Has A Horizontal Pump, Stainless Steel Filter Screens, Collection Tank, Drain, And Make Up Valves

3.Specifications For Each Stage Are Shown Below – Approx total OAL: 44’Part size capacity: 3’W x 5’H x 6’ L
STAGESGPM
FUNCTIONTIME & TEMPPUMPS LENGTH
ENTRY 5’ 0”
STAGE 1 90 SEC 0-140 degree (1) 12’ 0”
DRAIN40 SEC 5’ 0”
STAGE 240 SEC AMBIENT (1) 5’ 0”
DRAIN40 SEC 5’ 0”
STAGE 350 SEC AMBIENT (1) 7’ 0”
EXIT 5’ 0”


4.Stages are Equipped With Risers On 12” Centers, Cleaning Nozzles On Approximately 12” Centers Vertically, All Risers And Distribution Piping Are Schedule #80 CPVC. Piping From The Pump
to The Header is Steel Tube.

5.Risers are equipped with “quick” disconnect fittings

6.Exhaust Fans Are At Each End Of The Washer

7.Each Stage Has Independently Removable, Double, Stainless Steel Filter Screens Near The Pump Intake Area With A Retractable Dam.

8.Washer Tanks and Tunnel Are Mild Steel.

9.Access Lids Provided In The Top Of The Tanks

10.Tunnel Access between Stages

Blow-Off Tunnel

1.Tunnel to be 10’ high x 6’ wide x 15’ long
2.Two (2) turbulator fans to provide downward air movement to remove residual water from wash cycle.
3.Steel frame to support conveyor and ceiling mounted fans.
4.Exterior aluminized interlocking panels to cover outside of frame for moisture containment.

Industrial Resources Inc
PO Box 505 Old Saybrook CT 06475-0505
Tel: 860-388-3439 Fax: 860-388-2740
Email (Request Quote): ray@industrial-resources-inc.com
Web: www.industrial-resources-inc.com



- Search equipment by:  
 


Used Equipment
Used Equipment
Used Equipment
Used Equipment
UEN is a product of and is operated by Halliburton Systems Inc of Denville NJ
Used Equipment
Used Equipment