 |
Subscribe to RSS
SITE HELP? 973-625-9292 EMAIL
|
|
 |
0P0248
PAINT SYSTEMS & EQUIPMENT(Including Powder Coating Lines)
Custom, No. 6-Stage SST, 2' x 5' Part, Custom remanufactured in line SST washer with blow-off, 2-heated gas stages - OAL 69' - Remfg 2010
Ref:
16215
6-STAGE IN LINE WASHER & DRY-OFF QUOTE# 16-215
GENERAL DESCRIPTION: Tanks and Tunnel to be fabricated using new formed mild steel sheets, with powder coated finish. Pumps, valves and controls to be rebuilt
Type: 6 Stage(s) with Blow-Off Profile Opening: 2x 5 OAL: APPROX 69
Stage 1 5 Vestibule Entry - 6 Heated Alkaline Wash Gas fired heated tank, 120-140F
5 Drain Section
Stage 2 4 Ambient Rinse with halo riser for make up water
5 Drain Section
Stage 3 8 De-Oxidizer Ambient temp
5 Drain Section
Stage 4 4 Ambient Rinse with halo riser for make up water
5 Drain Section
Stage 5 4 Trivalent Chromate 110F
5 Drain Section
Stage 6 4 Ambient Rinse with halo riser for make up water
3 Blow-Off Section - 5 Vestibule Exit
Washer Construction: Shell will be new Stainless Steel (12 ga. tanks-20 ga. tunnel) Built to the specifications shown. Pumps and controls will be used/reconditioned. Pumps will be controlled via man
al start/stop stations. Electric Emersion Heaters will be used on the heated stage(s). Heaters will be controlled via a control panel including contactors, temperature controls and safety devices.
Industrial Resources Inc
PO Box 505
Old Saybrook CT 06475-0505
Tel:
860-388-3439
Fax:
860-388-2740
Email (Request Quote):
ray@industrial-resources-inc.com
Web:
www.industrial-resources-inc.com
|
|
|  |
|
 |